| Section |
Page |
Sub-Section |
|
Purpose, Scope, Applicability and Definitions |
7.00 |
7.0 |
|
Requirements for Single-Phase Overhead/Underground Line Extensions Built and Owned by CMP Effective 1/1/07 |
7.01
7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 |
7.01
7.1 7.1 7.1 7.1 7.1 7.1 7.1 7.1 |
|
Requirements for Polyphase Overhead/Underground Line Extensions Effective 1/1/07 |
7.10
7.11 7.12 7.13 7.14 7.15 7.16 7.17 |
7.2
7.2 7.2 7.2 7.2 7.2 7.2 7.2 |
|
Requirements for Owner Constructed Lines Effective 1/1/07 |
7.18
7.19 7.20 |
7.3
7.3 7.3 |
|
Requirements for Customer-Owned Line Extensions Effective 1/1/07 |
7.21
7.22 7.23 7.24 7.25 7.26 |
7.4
7.4 7.4 7.4 7.4 7.4 |
|
Single-Phase Overhead/Underground Line Extensions Cost Reallocations Effective 1/1/07 |
7.27
7.28 |
7.5
7.5 |
|
Deflations Factors for Estimating Original Cost of Private Line Extensions |
7.29
7.30 |
7.5
7.5 |
|
Standard Plan of Single-Phase Overhead Line Extensions Effective from 1/6/82 to 6/30/86
|
7A.1
7A.2 |
Appendix A
Appendix A |
|
Standard Plan of Single-Phase Overhead Line Extensions Effective from 7/1/86 to 5/31/91 |
7A.3
7A.4 |
Appendix B
Appendix B |
|
Requirements for Single-Phase Overhead Line Extensions Effective from 6/1/91 to 11/30/93 |
7A.5
7A.6 7A.7 7A.8 7A.9 7A.10 7A.11 7A.12 |
Appendix C
Appendix C Appendix C Appendix C Appendix C Appendix C Appendix C Appendix C |
|
Requirements for PolyPhase Overhead Line Extensions Effective from 6/1/91 to 11/30/93 |
7A.13
7A.14 7A.15 7A.16 7A.17 |
Appendix C
Appendix C Appendix C Appendix C Appendix C |
|
Requirements for Polyphase Overhead Line Extensions Effective from 1/1/97 to 5/31/97 |
7A.18
7A.19 7A.20 7A.21 7A.22 |
Appendix D
Appendix D Appendix D Appendix D Appendix D |
|
Requirements for Single-Phase Overhead Line Extensions Effective from 12/1/93 to 12/31/99 (as modified August 8, 1998 in Docket No. 97-857) |
7A.23
7A.24 7A.25 7A.26 7A.27 7A.28 7A.29 7A.30 7A.31 7A.32 |
Appendix E
Appendix E Appendix E Appendix E Appendix E Appendix E Appendix E Appendix E Appendix E Appendix E |
|
Requirements for PolyPhase Overhead/Underground Line Extensions Effective from 6/10/97 to 12/31/99 (as modified August 8, 1998 in Docket No. 97-857) |
7A.33
7A.34 |
Appendix E
Appendix E |
|
Other Overall Requirements Applicable to Single-Phase and Polyphase Line Extensions Prior to 12/31/99 (as modified August 8, 1998 in Docket No. 97-857) |
7A.35
7A.36 |
Appendix E
Appendix E |
|
Requirements for Single-Phase Overhead/Underground Line Extensions Effective 1/1/00 to 5/11/02 |
7A.37
7A.38 7A.39 7A.40 7A.41 7A.42 7A.43 7A.44 |
Appendix F
Appendix F Appendix F Appendix F Appendix F Appendix F Appendix F Appendix F |
|
Requirements for Polyphase Overhead/Underground Line Extensions Effective 1/1/00 to 5/11/02 |
7A.45
7A.46 7A.47
|
Appendix F
Appendix F Appendix F |
|
Requirements for Customer-Owned Line Extensions Effective 1/1/00 to 5/11/02 |
7A.48
7A.49 7A.50 7A.51 |
Appendix F
Appendix F Appendix F Appendix F |
|
Requirements for Engineering Designs for Customer-Owned Line Extensions Effective 1/1/00 to 5/11/02 |
7A.52 |
Appendix F |
|
Requirements for Single-Phase Overhead/Underground Line Extensions Built and Owned by CMP Effective 5/12/02 to 12/31/06 |
7A.53
7A.54 7A.55 7A.56 7A.57 7A.58 7A.59 7A.60 7A.61 |
Appendix G
Appendix G Appendix G Appendix G Appendix G Appendix G Appendix G Appendix G Appendix G |
|
Requirements for PolyPhase Overhead/Underground Line Extensions Effective 5/12/02 to 12/31/06 |
7A.62
7A.63 7A.64
|
Appendix G
Appendix G Appendix G |
|
Requirements for Owner-Constructed Lines Effective 5/12/02 to 12/31/06 |
7A.65
7A.66 7A.67
|
Appendix G
Appendix G Appendix G |
|
Requirements for Customer-Owned Line Extensions Effective 5/12/02 to 12/31/06 |
7A.68
7A.69 7A.70 7A.71 7A.72 7A.73 |
Appendix G
Appendix G Appendix G Appendix G Appendix G Appendix G |
|
Single-Phase Overhead/Underground Line Extension Cost Reallocations Effective 5/12/02 to 12/31/06 |
7A.74
7A.75
|
Appendix G
Appendix G |